Skip to content
dRemodeling
Bright white shaker kitchen with a large quartz island and counter stools, remodeled by dRemodeling in Philadelphia

SERVICES /  KITCHEN REMODELING

A Kitchen That Works Beautifully.

Kitchen Remodeling in Philadelphia & the Main Line

One design-build team plans, designs and builds your kitchen, backed by a 5-year workmanship warranty.

Since 2007

Remodeling Philadelphia-area homes

Philly Favorite

Gold 2024 · 2026: Gold Interior Design, Silver Kitchen Remodeler, Bronze Bathroom Remodeler

5-Year Warranty

On our workmanship

REMODELING PROCESS

Our kitchen remodeling process

From concept to completion, our all in-house team brings your dream kitchen to life.

Cabinet door and countertop samples in the dRemodeling showroom
STEP 1 · SELECTIONS

1. Showroom selections

See, compare, and select every finish in person, all in our showroom with designer guidance. Visit our showroom →

3D rendering of a navy and brass kitchen designed by dRemodeling for a Melrose Park home
STEP 2 · 3D DESIGN

2. Design & 3D views

We build your layout around your selections and show it to you in interactive 3D before anything is built.

dRemodeling crew installing kitchen cabinets during construction
STEP 3 · IN PROGRESS

3. Construction & management

One dedicated project manager coordinates every detail, from permits to scheduling.

The finished navy and brass kitchen in Melrose Park, PA, built from the 3D design
STEP 4 · FINISHED

4. Final walkthrough

We walk the finished space with you, complete anything left, and your warranty begins.

BEFORE & AFTER

Same room. Completely new kitchen.

Kitchen before remodeling: oak cabinets and a dated layout
BEFORE
Same kitchen after the dRemodeling remodel: white cabinets, a center island, custom wood hood and floating shelves
AFTER
More before & after projects →

COST & TIMELINE

What does a kitchen remodel cost?

Every kitchen is unique, but most projects fall within one of two investment ranges. We’ll help you understand where your project fits based on your space, scope, and selections.

MAINTAIN EXISTING KITCHEN LAYOUT

$70K–$110K+

New cabinetry, counters, backsplash, lighting, flooring and appliances in the same footprint.

RECONFIGURE EXISTING KITCHEN LAYOUT

$110K–$180K+

Moving plumbing or gas, removing walls, opening to the family room, or adding an island.

TYPICAL TIMELINE

About 5–6 months, from first call to finished kitchen

1 · GETTING STARTED
About 2–3 weeks
Discovery call, home assessment, showroom consultation
2 · DESIGN
About 4–6 weeks
Layout, 3D design and selections
3 · ORDERING & DELIVERY
About 4–6 weeks
Materials ordered and delivered
4 · CONSTRUCTION
About 9–12 weeks
12+ weeks with a new layout

Timelines provided are based on typical construction durations, and are not guaranteed. A more detailed schedule will be provided to you once the project scope is confirmed.

“The whole process, from working with skilled designer Emma, to the finished product, took around 6 months.”
— Cathleen M., Google review

4.8 ON GOOGLE · 4.9 ON HOUZZ

Real Stories, Real Kitchens

★★★★★
“We recently worked with dRemodeling on a full kitchen remodel, and couldn't be happier with the entire experience.”
Emily K. · Google review · Kitchen remodel
★★★★★
“I chose dRemodeling to redo my kitchen because I wanted a turnkey operation, with one company responsible for the design…”
Linda R. · Angi review · Kitchen remodel
★★★★★
“We had our existing kitchen ripped out and the entire area redone, which included taking down a load-bearing wall…”
Matthew M. · Angi review · Kitchen remodel
Read all reviews →

KITCHEN REMODELING FAQ

Questions homeowners ask us

How much does a kitchen remodel cost in the Philadelphia area?

Most of our kitchens run $70,000–$110,000+ in the same layout, and $110,000–$180,000+ when walls, plumbing or the footprint change. See our Pricing Guide for examples.

How long does a kitchen remodel take?

Most kitchens take about 5–6 months from the first call to the finished kitchen: getting started (about 2–3 weeks), design (about 4–6 weeks), ordering and delivery of materials (about 4–6 weeks), then construction (about 9–12 weeks, or 12+ with a new layout). Timelines are typical, not guaranteed; a more detailed schedule is provided once the project scope is confirmed.

Can we live at home during the remodel?

Yes, most families do. We seal off the work area and clean up daily. Ask us about setting up a temporary kitchen.

Can you move walls or change the layout?

Yes. We check structure, plumbing and electrical, handle permits, and price the change before you commit.

Do you help with design and selections?

Yes. Our designer creates the layout and 3D drawings and guides every selection to fit your budget.

Can I see materials before I commit?

Yes. Visit our showroom at 7709 Ridge Avenue, Philadelphia (by appointment) to see Dura Supreme and our other cabinet lines, counters, tile and fixtures in person.

What happens at the first consultation?

We talk through your goals, budget and timing, then measure your kitchen. You leave knowing the next steps and a typical cost range.

Let’s plan your new kitchen.

Tell us about your project. We’ll reach out within one business day, or you can choose a convenient time for us to call you.

Scheduling a callback is optional.

SHOWROOM
7709 Ridge Avenue
Philadelphia, PA 19128
HOURS
Mon–Fri, 9 am – 5 pm
Showroom by appointment
View kitchen projects →

Kitchen remodeling in Philadelphia, the Main Line, and Montgomery, Bucks, Delaware and Chester counties.

Privacy policy